Global SOX

Your SOX programme across every entity, in one platform

A group with twenty subsidiaries often maintains twenty versions of the same Risk and Control Matrix (RCM). Global SOX replaces them with a single library. Each control is written once, rolled out to the entities that perform it, and every project tests against that same library. The Chief Audit Executive (CAE) approves the scope and each project before work begins. Evidence is received against each request, Staff Auditors document testing on a workpaper, and the final report is issued only after every control and every management response has been signed off.

The Challenge

The expertise is rarely the problem. The difficulty is that the work is spread across workbooks, email threads and shared folders, and keeping them aligned becomes a task in itself.

Inconsistent RCMs Across Entities

When the group revises a control description, only some subsidiaries update their workbooks. By year end, it is unclear which version of the control was actually tested.

Undocumented Scoping Decisions

The decision on which entities are in scope is often recorded only in an email thread. When the external auditor requests it at year end, it is difficult to produce.

Repetitive and Untracked Evidence Requests

Each control owner receives a separate email requesting documents. Responses are incomplete, forwarded or incorrect, and tracking outstanding items requires a separate spreadsheet.

No Reliable Approval Trail

Testing is reviewed on a call, responses are agreed over email, and the report is signed off in a meeting. Evidencing these approvals later is time-consuming and unreliable.

What Global SOX Delivers

  • Each control is written once and used by every entity that performs it
  • The annual SOX scope is approved by the CAE and retained on record
  • Outstanding documents are visible for each control
  • Testing reviewed and approved by the Audit Manager and the CAE
  • Management responds once testing is complete, rather than control by control

What Global SOX Does

Maintain a single risk and control library for the entire group. Confirm each year which entities are in scope. Run each testing project from the first evidence request through to the final report.

Single Risk and Control Library

Upload your existing RCM or build it on screen. Each control records its type, frequency, COSO component, assertions, sampling criteria and testing steps. A master control can be rolled out to sub-entities, cloned to another entity, or edited once and applied across all entities.

  • Automated, manual or semi-manual; preventive, detective or corrective
  • Classified as Operational, Financial, ITGC, ELC or Stat Compliance

Validated Excel Upload

No data is saved until the file passes validation. Every error is displayed in a preview grid, where it can be corrected before the upload is committed. Alternatively, the error report can be downloaded and corrected in Excel.

  • Templates for RCM, Risk Master and Control Master
  • Complete history of every upload and the user who performed it

Approval-Controlled Library Changes

When an Audit Manager edits, adds, deletes or links a risk or control, the change is submitted to the CAE as a change request. The CAE reviews exactly which fields have changed and either approves the request or returns it with a comment.

  • Deleted records can be restored
  • Every change is logged with its previous and new value

Annual SOX Applicability

List every entity and sub-entity, mark each as Yes or No, and submit the list to the CAE. Once approved, it is locked. If the scope changes during the year, a new version is raised, for example SOXA-2026-000001 v2, and the previous version is archived.

CAE-Approved Testing Projects

Select a control-wise or entity-wise approach, the audit period, and the processes and entities in scope. Exclude any deferred controls, assign staff by entity, process or control with start and due dates, and submit the project to the CAE.

  • The CAE can defer or reinstate controls during approval
  • Scope can be limited to the entities marked Yes in the applicability
  • Projects can be closed or reopened as required

Evidence Requests and Uploads

The data requirements for each control form its Information and Document Request (IDR). Staff submit it to the Audit Manager, who approves it and releases it immediately or on a scheduled date. Control owners then upload files against each line, or upload all files at once and allow the system to match them to requests by name.

  • Process Owner and Business Head are copied as escalation contacts
  • Further evidence can be requested through an Additional Data Request (ADR)
  • Files that do not meet the request can be returned with a reason

Workpapers and Review

Staff record the population, sample, exceptions and test steps, rate design and operating effectiveness, and conclude each control as Pass or Fail. Each failed control receives a gap analysis with root cause and recommendation. The review then proceeds to the Audit Manager and on to the CAE.

  • Multiple controls can be approved or returned at once

Management Response

Responses open for all failed controls together, once testing of the entire project is complete. The control owner records the response, action plan, responsible owner and target date. The Process Owner or Business Head approves it first, followed by audit staff, the Audit Manager and the CAE.

Reports and Analytics

Each project provides a live view of testing progress, effectiveness rate, deficiencies by process and staff workload. The final report is issued once all items are approved and can be downloaded as a PDF, organised by entity or by control.

Chat and Reminders

Each control has a dedicated chat thread with the client contacts, so queries about a document remain alongside it. Your administrator configures which reminders are sent, on which days and to whom, so overdue items are followed up without manual effort.

How It Works

The key steps, in the order your team completes them.

  1. 1

    Load the RCM

    Upload the Risk and Control Matrix and roll out each control to the entities that perform it.

  2. 2

    Approve the Scope

    Mark which entities are in SOX scope for the period. The CAE approves the scope.

  3. 3

    Set Up the Project

    The Audit Manager selects the period, scope, controls and staff, and submits the project to the CAE.

  4. 4

    Issue the IDR

    Staff prepare the document request for each control. The Audit Manager approves and releases it.

  5. 5

    Collect Evidence

    Control owners upload files. Staff accept them, return them or request additional data.

  6. 6

    Test Controls

    Staff complete the workpaper and conclude each control as Pass or Fail.

  7. 7

    Review Testing

    The Audit Manager and then the CAE approve or return each control.

  8. 8

    Obtain Management Responses

    Control owners respond on failed controls. The business and then audit approve the responses.

  9. 9

    Issue the Report

    The final report is issued to the audit team and the client contacts.

Outputs and Compliance Alignment

The records the module produces, and the regulations and frameworks they support.

Reports and Records

  • Risk and control library, showing the entities to which each control applies
  • Approved SOX applicability for each period
  • Approved project scope and staff assignments
  • IDR list with the evidence received against each line
  • Workpapers with samples, exceptions and conclusions
  • Gap analysis for every failed control
  • Management responses with action plans and target dates
  • Final SOX testing report (PDF)
  • Log of every change made to the library

Built Around

SOX Section 404
Testing of internal control over financial reporting across all entities in scope.
SOX Section 302
A current view of control status to support officer certifications.
PCAOB AS 2201
Workpapers and evidence in the format reviewed by the external auditor.
COSO Internal Control (2013)
Each control is mapped to its COSO component, and each risk to its financial statement assertions.
Companies Act 2013, Sec 134(5)(e) and 143(3)(i)
Supports Indian groups operating Internal Financial Controls (IFC) on the same control library.

These references describe the context the module is designed to support. They are not a statement of certification, and do not replace professional judgement on your reporting obligations.

Roles and Responsibilities

Every role works on the same record, and each sees the part for which it is accountable.

Chief Audit Executive
Approves the scope, each project and changes to the library, and provides final sign-off on testing and management responses.
Audit Manager
Sets up projects, approves IDRs before they are released, and reviews testing.
Staff Auditor
Prepares IDRs, examines evidence, tests controls and reviews management responses.
Control Owners
Upload evidence and prepare the management response on failed controls.
Process Owners and Business Heads
Act as escalation contacts on each control and as first approvers of the management response.

Frequently Asked Questions

If your question is not covered here, please contact us and our team will answer it for your specific requirements.

Why is the module called Global SOX?

It is designed for groups. Your organisation maintains a single set of risks and controls and rolls it out to every entity, sub-entity and division that uses it. A single project and a single report can cover multiple entities.

How does Global SOX differ from Control Testing?

Control Testing is suited to a single entity running a testing project. Global SOX adds the capabilities a group requires: a shared control library with approved changes, annual scope approval, CAE approval of each project, scheduled IDR release, Additional Data Requests, and an extended approval chain for management responses.

Can we import our existing RCM?

Yes. Download the template, enter your RCM, and upload it. Any issues, such as a missing owner or an unrecognised entity, are shown in the preview and can be corrected before any data is saved.

Can the approval workflow be configured?

Yes. Your administrator defines who approves library changes, scope and testing, with up to four stages for each. By default, approval is by the Audit Manager followed by the CAE.

Why do management responses not open immediately?

This ensures management sees the complete picture. Responses open once every control in the project has been tested and approved, and all failed controls are then sent together.

See Global SOX Applied to Your Organisation

Schedule a one-hour session with our team. We will demonstrateGlobal SOX using your own processes and controls, so you can assess how a complete cycle would work for your organisation.